Tuesday, 12 November 2019

Batemans Bay Foreshore - Ideas -- Whose ideas?


Council has denied the Boaters Association a site on the foreshore this weekend where they hope to promote ideas and event to activate the area.



The Association was actively involved in the Bridge Replacement Foreshore Committee and realised that many of the good ideas put forward during that process were going nowhere.
We wrote a document “A Game Changer for the Bay CBD” see here where we proposed floating pontoons parallel to the CBD and many water based activities to energise this great venue. This document was widely distributed to the Local Member, Hon Andrew Constance, the Shire and others. It was presented at a “Town Hall” meeting back in July of this year. The document reached the Shire’s consultants Inspiring Places who were employed to come up with a plan for the foreshore and how it could be a nucleus for activities and functions to stimulate the area. All contained in the Associations document.

The one-on-one discussions with the consultants was fruitful and insightful. They have experience in Tasmania and some great ideas BUT their brief had been limited by the inevitable vested interests along the foreshore.

The Association requested a meeting with Inspiring Place prior to this week-ends display of their recommendation so that we would not be in conflict with their ideas. This was denied by the Council employee.

The Association requested a stand on the foreshore during this week-end along with other Associations and business . This was denied because our desire to promote boating on the Clyde, the installation of floating pontoons and ideas for the CBD “does not align with their (Councils) purpose.”

One can only ask why is Council shutting out ideas and an Associations wishing to promote the Bay?

Furthermore in the current State of Emergency ahead of catastrophic fire warnings the Mayor can not find time to meet with the Association to brief her on the potential fire and safety dangers within the local Batemans Bay marina. The Department of Land alleges that the Fire Safety Equipment and certificates are non-compliant – a fact we have been raising for more than three years.

Is this just another attempt to stifle information and the Association’s attempt to make the waterfront a safe and vibrant place?



Batemans Bay - a potential unsafe zone

With the Batemans Bay marina a potential unsafe zone it now appear we have a further danger area during the busy holiday period. The bay itself.
Floating unlit dredging pipe extending from the Bay bar area right across the water to the middle of the inner bay area. In fact from the bar to the isolated danger mark north of the sand bank. Why is this a danger.

The Minister for Transport for NSW stated in 31 January 2019 “The Maritime Infrastructure Plan notes the importance of maintaining accessible navigation channels in key investment locations, including the Batemans Bay (Clyde River) entrance channel,” said Mr Constance. More on keeping navigation channels open next week.
Mr Constance goes on to say “NSW Government will invest almost $450,000 into the Clyde River entrance bar for dredging in the coming months” The Association believes this is money from boaters licences and fees managed by the Maritime Infrastructure Delivery Office and not other Government funds.
The Ministers' response was motivated by a petition raised by the Marina based on questionable assertions and data. It received only 461 responses.  The manager stated “Our local member has listened, acted and will deliver a project that puts the safety of local and visiting boaters at the fore.”
Well Minister act now for the safety of the boating public and delay the dredging until after the holiday period or until the GHD study finds out that happens to the sand within the bay.
The Marine Notice S01948 Navigation Restriction - Entrance Bar to the Clyde River, Batemans Bay - Dredging operations. Will soon be out of date.
The Notice states: The dredging operations are to take place from Monday 7 October 2019 to Wednesday 20 November 2019. The notice states” Dredging operations will occur during daylight hours only, however the dredge and associated equipment may remain in position outside times of operation.” Yes at night.
Further “Vessels are required to maintain a safe distance and speed from the works” a fine of about $5,500 could apply if you contravene this. So when crossing this dangerous bar keep your speed down because you may impact these works rather that adjust your speed for the safety of the crew of a vessel crossing the bar. That is just good seamanship.
No work has started on dredging the bar.
So if it continues it will take place during the busy holiday period and be a danger to boat leaving hanging rock boat ramp and going to sea.
Furthermore, as the Association has stated previously it should be delayed until the GHD modelling and investigation is complete. (This consultancy is funded by Transport for NSW) The Association has for a long time held that introducing the sand back into the bay will have dangerous unintended consequences that could cause water inundation of the locals properties and even the CBD.
Minister Constance: You are responsible for these projects, please delay the dredging now, not only for safety reason but wait until your consultancy has some answers. The Association is still waiting for answers from our Critical Analysis of flood damage caused by the new bridge given to RMS and your office.

Friday, 8 November 2019

More dangers within the Bay and Bar

With the Batemans Bay marina a potential unsafe zone we now appear to have a further danger area during the busy holiday period.
Floating unlit dredging pipe extending from the Bay bar area right across the water to the middle of the inner bay area. In fact from the bar to the isolated danger mark north of the sand bank. Why is this a danger.
The Minister for Transport for NSW stated in 31 January 2019 “The Maritime Infrastructure Plan notes the importance of maintaining accessible navigation channels in key investment locations, including the Batemans Bay (Clyde River) entrance channel,” said Mr Constance. More on keeping navigation channels open next week.
Mr Constance goes on to say “NSW Government will invest almost $450,000 into the Clyde River entrance bar for dredging in the coming months” The Association believes this is money from boaters licences and fees managed by the Maritime Infrastructure Delivery Office and not other Government funds.
The Ministers' response was motivated by a petition raised by the Marina based on questionable assertions and data. The manager stated “Our local member has listened, acted and will deliver a project that puts the safety of local and visiting boaters at the fore.”
Well Minister act now for the safety of the boating public and delay the dredging until after the holiday period or until the GHD study finds out that happens to the sand within the bay.


The Marine Notice S01948 Navigation Restriction - Entrance Bar to the Clyde River, Batemans Bay - Dredging operations. Will soon be out of date.
The Notice states: The dredging operations are to take place from Monday 7 October 2019 to Wednesday 20 November 2019. The notice states” Dredging operations will occur during daylight hours only, however the dredge and associated equipment may remain in position outside times of operation.” Yes at night.
Further “Vessels are required to maintain a safe distance and speed from the works” a fine of about $5,500 could apply if you contravene this. So when crossing this dangerous bar keep your speed down because you may impact these works rather that adjust your speed for the safety of the crew of a vessel crossing the bar. That is just good seamanship.
No work has started on dredging the bar.
So if it continues it will take place during the busy holiday period and be a danger to boat leaving hanging rock boat ramp and going to sea.
Furthermore, as the Association has stated previously it should be delayed until the GHD modelling and investigation is complete. (This consultancy is funded by Transport for NSW) The Association has for a long time held that introducing the sand back into the bay will have dangerous unintended consequences that could cause water inundation of the locals properties and even the CBD.
Minister responsible for these projects delay the dredging now not only for safety reason but wait until your consultancy has some answers. We are still waiting for answers from our Critical Analysis of flood damage caused by the new bridge.

Monday, 28 October 2019

Budget Blow-out at the Batemans Bay Bridge?

The Association Inc represents all form of recreational and commercial activity on the water of the South Coast of NSW.  Our members enjoy the waters off the town of Batemans Bay as well as travelling the tranquil reaches of the Clyde River to the historic trading port of Nelligen.



In 1956 a steel vertical lift truss bridge with a maximum height of 34 m was built across the Clyde at Batemans Bay.  The lifting span could be raised on request when both recreational and commercial vessel wished to travel these waterways. The Clyde River was first found to be navigable in 1854 and has been a vital link from up-stream to the sea since that time. In 2015 the Local Member and then treasurer Hon Andrew Constance announced that a new concrete bridge would be built to span the Clyde River at Batemans Bay to replace the current bridge due to “road traffic delays”. The height of this new bridge is only 12 metres.  This will deny the continued access by trading and commercial vessels plus most recreational watercraft to Nelligen.  We believe this unilateral decision by the NSW government will breach our rights of free passage under Maritime Law and may contravene a section of the Australian Constitution. The final design for the bridge was announced in 2018 and John Holland, a wholly owned Chinese company, won the tender for the construction for the sum of $274 million. The Association understands that the current built schedule is at least six months behind schedule due in part to a few significant accident which has shut down the Mogo concrete manufacturing facility. 


It is our understanding that the Transport for NSW Departmental flood modelling due diligence report has been critically reviewed and brought into question. There appears to be a blow-out in the budget with speculation that it may well be three times the allocated budget. The Association will investigate if the budget for this roads and Infrastructure project has in-fact been adjusted which, if it is the case, that will see NSW taxpayers having to fund any shortfalls.
  

Monday, 30 September 2019

Batemans Bay Bar to be Dredged - Again

The Marine Notice has been issued to inform boaters that there will be Navigation Restriction during dredging operation which will take place from Monday 7 October until Wednesday 20 November 2019.
As always vessel owners should operate their vessel with caution when in the vicinity. It is expected that the dredging pipe will be in place for the duration of the dredge while the barge may only be in place during daylight hours – same as last time in 2016 and in 2012.


The notice state: “Vessel operators should continue using the Clyde River Bar Leads as an aid to navigation when crossing the bar.” The Association has been pushing as hard as we can to get a Notice to Mariners posted when the leads are moved because they do not indicate the best passage over the bar and you adjust but when they move them you dont know and you run aground. Currently they are well outside the area they should be on the Australian AUS 191 chart but that is a technical issue which skilled Mariners would only notice. See Photo in 2016 when they indicate the channel way to the north then last month when they indicate the channel way to the south.



It appears that unlike the last time the bar was dredged the current dredged sand (spoils) will be reintroduced into the water in the area of the isolated danger mark – right in the middle of the Bay. Why there you may ask? There has not been a single digital or physical model undertaken by any organisation as to the sand movement within the bay. There is the diagram drawn for the BB Coastline Hazard Management Plan in 1997 from the original Patterson Britton & Partners 1992 document. See below. While indicative it may not be correct.


This clearly shows that when the dredged sand come out of the dredging pipe next week they will move towards the north west beach area of Surfside or more likely back out into the bay and again be deposited on the bar or in the bay off Corrigan’s Beach.
2016 sand deposited before removal to Surfside


How does the Association or in fact anyone else know this? We dont. It is all speculation and even with the local knowledge base of the Association members we can not predict what will happen. So how can this happen in this day and age of GHD modelling of the impact of civil works on the northern Surfside beaches and elsewhere in the Bay. Do I have to state the obvious – vested interests have again come into play to try and prop-up the desire by politicians and bureaucrats to just be seen to do something.

See the Critical Analysis post GHD Study

Members of the Association have been calling along with many others for a scientific study to be undertaken on the movement of sand within the bay and this to feed into a benefit cost analysis of when, why and where dredging should take place if at all.

With the new bridge under construction and the flood and flow analysis so under a cloud why would anyone sign-off on dredging the bar and then adding that sand back into the bay thus confusing any previous analysis. It is just madness.





NSW Maritime’s ‘Boating Now Program – what does the future hold?

In the late 1990s NSW Maritime introduced the “Better Boating Program” (BBP) where funds would be provided mainly to Councils in NSW to build new infrastructure or upgrade existing facilities for the boating community.
The funds were derived mainly from Recreational and Commercial boating licences and registrations. In 2014 the program name was changed to “Boating Now Program” (BNP) which concludes in 2019.
One significant change was with grants provided by way of the BBP where regional councils were required in the majority of instances to contribute 50% of the project cost. As an example the cost of upgrading the Crowdy Head facility (mid-North Coast) in 2003 was $169,662 and council was required to contribute $84,831.
With the revised BNP the contribution was relaxed with many grants to assist councils in upgrading facilities. As of July 2019 there are still 74 projects approved by BNP to potentially be completed by conclusion of 2019. From the 1st July 2019 NSW Maritime has been incorporated into Transport for NSW and there has been no announcement pertaining to a replacement program for the BNP for 2020 and beyond.
What is the future for improved infrastructure for recreation and commercial boating in NSW and where will the revenues from Licences and registrations be allocated … Consolidated Revenue?
Dennis Donald, Project Officer,
Amateur Fisherman’s Association of NSW
From AFLOAT October 2019

The last round of funds we received in the Eurobodall went into expanding the car park at Nelligen and an improved ramp and car park at South Durras - that is right next to the walkway and fishing platform. Two of the best boat ramps we have in the Shire - no comment on why
So if you are unhappy with the situation and want to focus attention on improving your local boat ramp facilities complete the ESC survey.
Highlight the lack of floating pontoons to secure and access your vessel, the poor fish cleaning tables, the lact of preparation areas and wash down facilities plus the usual BBQ and seating for the tourist to watch you come and go.
Here is the survey link. https://www.surveymonkey.com/r/DM3JXR2


Sunday, 14 July 2019

Lost Opportunities of the BB Bridge

Lost Opportunities of the BB Bridge


At an Open Forum a number of concerns were expressed while two great opportunities were discussed. They are not new ideas having been presented to the Bridge Foreshore Advisory Committee (FAC). However both seemed to have slipped between the cracks in the RMS creative writing report “Summary of feedback from FAC” or was that the ideas being so good they were swept under the carpet.
First Opportunity presented is to reconfigure the northern foreshore road network to make it more free flowing, simple and more accessible to cars and people. It addressed the major concerns regarding the old punt road boat ramp and accessibility.
In summary the slip road going south would be moved westwards away from the residential area, terminate in a T junction or roundabout but the main feature is that coming down the road one would be able to see the Bay before you and the new viewing platform on the north shore. The car parks would be on your left – an easy decision to park and walk through Korners Park to the viewing platform. The car parks are moved to park side of the road (safer for kids) not the confusing layout proposed by RMS.
If you wish to launch your trailer boat, again an easy decision move forward to enter the preparation area. After getting your boat ready you swing right and reverse down the proposed two lane boat ramp and into the water. Launch your vessel and secure it to the floating pontoon just down stream. Return to the vehicle and park it in the appropriate spots. Now that is an improvement. No confusing route decisions and no confrontation with other cars or boaters.
Now the water settling pond used to collect the water and oil run off from this side of the bridge. This pond would be relocated from the proposed position to the east of the slip road and towards the residential area at an elevation that would require a earth bank rising up to the trees and the apartments. This would significantly reduce the noise to these residents, improve the visual impact and in fact increase the water area to turn it into a feature rather than an imposition.
Those walking from the south would cross the bridge on the eastern side of the four lanes, descend a flight of steps (reduced number) or a zig zag path, and walk towards the river only requiring one crossing of a minor road not as RMS proposes a pedestrian crossing at the slip road where cars will be approaching at 60 or 80 Km/h and then two further road crossings if you can not use their steps. Now this opportunity is innovative, logical, practical and safe. So why was it swept under the carpet and not even get a mention in the “Summary of feedback from FAC”….. well you tell me.
Second Opportunity not discussed for other reasons. Again not new but embraced by the Minister for Transport for NSW at a very early stage but dropped like a hot potato when the bureaucrats got into his ear.

Observation Deck or viewing platform at the middle of the bridge. 


This will enhance the tourist potential of the new bridge by locating a cantilevered semi-circular observation deck at the highest point of the new bridge. It would add 1.5 m to the already wide cycle and pedestrian path at the highest point - middle. (Will you be able to see the Bay from the outside lane of the south going lanes? – not unless you drive a semi-trailer)
One could stand on this observation deck and view the wide expanse of the bay with an information panel pointing out the current and historic features of the town and bay. It could also be the joining place between the aboriginal heritage aspects of the northern shore with the more modern town center of the southern shore with its water based history. Now why was this alternative not mentioned in the above document and also swept under the carpet?…… well you tell me.
The presentation of the “Game Changer for the Bay CBD” – the community proposal for more floating pontoons was well received with a flurry of communication after its release.
The audience attending at the Open Forum was disappointing but as the organisers were told by many, the civil engineering aspects of the bridge have been signed off and the steamroller moves forward so we can do nothing to change those aspects.
Well, what of the other factors which can be changed because they are years away from construction, such as northern road layout, T-wharf, boat ramps and cycle paths - well who cares, it is not in my back yard and anyway it is all done and dusted and I’m just too busy to attend a Saturday evening meeting. Just fill by beer and pass we another snag.