Sunday, 30 June 2019

A Game Changer for the Bay CBD


A Community Proposal has been developed which recommends the installation of 200 meters of floating pontoon parallel to Clyde Street in the Bay’s CBD. This will improve the access to and from the water, rejuvenate and reactivate this area. It is downstream of the new bridge adjacent to the proposed viewing platform at the site of the old bridge. These pontoons extend toward the Promenade and give extra capacity for all form of vessels, cruise ship tenders, ferries, kayaks, fishing charters, visiting yachts and even seaplanes for scenic tours.

This goes much further than the John Holland’s proposed two pontoons but builds on the work that they have committed to. It moves the focus further into the CBD to the Promenade and address the issue of Clyde Street becoming a dead-end road.
It is recommended that the current concrete T-Wharf be modified and the end section removed to allow a movable on-ramp to extend from the shore to the floating pontoons secured to the sea-bed via integrated vertical piles. The pontoons will be 4 meters wide and run parallel to the shore right down to the start of the Promenade walkway. There will be a wide break in the middle so boats, kayaks and canoes may travel inside the pontoons and come alongside at any state of the tide. The second on-ramp will be at the Ampol wharf – outside the Starfish Deli to give access to the downstream section.

A secondary site specifically designed for smaller vessels and particularly seaplanes will be constructed at the current Mara Mia Walkway Pier viewing platform down stream from the start of the Promenade.
The pontoons are not only a marine infrastructure but a nucleus, in fact a Game Changer, for further business development, entertainment opportunities and information dissemination. This could become the hub for an all year round tourist location looking towards the water and Bay and not to the car parks and concrete.
The proposal could be funded partly from Dept. of Lands and Dept. of Transport – Maritime Boating Licence fees and other sources but could be the nucleus for further initiatives consistent with a number of Strategies and Action Plans adopted and proposed by the Shire and other bodies for the South Coast.
Long on-ramp at Bermagui

This proposal goes much further than the current suggestion in that it enhances the water land interface, provides increased capacity and improves access to the CBD for the boating and on-water community. It is designed for safety, functionality and disability access.
Kiama ocean pontoons


It will provide a catalyst for the activation and revitalisation of the area and bringing tourist and local expedition based activities right in to the heart of the Bay with:
  • Facilities for Cruise Ship tenders
  • Ferry rides up the Clyde
  • Oyster information tours to leases
  • Bird observation tours
  • Fishing trips
  • Sail the Bay excursions
  • Seaplane scenic flights locally or further afield
  • Kayak and canoe hire offerings
  • Revitalise the on-land area via pop-up activities such as music events, produce markets, art displays and fishing demos and displays.
The document proposes a primary and secondary site, gives the parameters and estimated costs of the structure and the installation. It answers many of the questions encountered while developing it. The justification to do something in this area is widespread and has been included in many other documents. The next step is to get acceptance and funding.

The Game Changer document can be downloaded here.

T-Wharf - Location of start of floating pontoons


Friday, 28 June 2019

Batemans Bay Bridge Urban Design and Landscape Plan

The local Member for Bega and Minister of Transport announced last week the closing down of the Bay Bridge Foreshore Advisory Committee (FAC) – holding a large photo of the proposed concrete T-Wharf and pontoons. This was a great disappointment for many of the community members of FAC. We have seen better alternatives at a FAC meetings earlier in the year.

This is a start and has some advantages but does not go far enough to improve the water land interface. The advantages are that the T-wharf pontoons put that area of the CBD front and center in the public's mind about the impact the new bridge will have on the Bay Foreshore.


John Holland and others proposes we maintain a 40 year old concrete wharf with no facilities and dangerous piers and append to each side some ill-designed floating pontoons with steel or concrete piles on the outside.
A cruise ship tender will not fit between the piles so the gap between vessel and pontoon is too wide for anyone to step off. Yes, mind the gap.
The on-ramp dominate the pontoons just waiting for some child to crawl under and be trapped as the pontoon moves up with the tide or passing ferry.

The Ministers statement includes “The existing T-wharf will be retained for those who currently require the fixed structure including local businesses and fishing groups.” Who are these local business and which fishing groups? The dive boat operator who has a mooring adjacent to the T-Wharf has been given his matching orders with no opportunity to return. So lets get these vested interest identified and ask why do they and not the FAC have such influence.

If you go to the interactive map (who paid for that extravagance?) Clyde Street will become a dead-end – yes a Cul-de-Sac. There are no on or off access roads from the new bridge like there are now. To get to the current boatramp you have to travel down North Street turn left under the new bridge – and then what? Turn into the reduced parking area and try to turn to back your trailer down the boat ramp. It is possible but exceptionally difficult. Gone is the turning road, preparation area and wash down section. Yes we have gone backwards.

What will happen to an interstate bus wanting to access the foreshore? Turn left into Clyde Street, negotiate a calming mini roundabout and proceeded to the dead end to attempt to turn and exit back past the CBD. Where will these buses park and take on passengers? We don't know because the traffic flow analysis has not been released.

The statement on Friday by the Minister flanked by those with direct interest in the foreshore was a big step backwards for the fishing and boating community. The local business particularly those with access from Clyde Street will have to be asking questions. Why is this major development in the Bay so ordinary and lacks vision and initiative? How will this improve the tourist economy of the Bay? What signature location will get them to stop and not continue southwards?

The FAC put forward many ideas – a viewing platform at the apex of the new bridge, lift towers for improved disability access to the bridge, moving the southern boatramp from under the shadow of the bridge to the west of Lions Park to name a few just on the south side.

This announcement while welcome will now give the community the opportunity to comment and show there concerns about how ordinary and lacking in vision the proposed foreshore is going to become. This is a missed opportunity to revitalize the CBD, make it a hub for tourist to want to come too. How about opening a tourist information Kiosk, a local produce display centre, a starting point for oyster information tours or sail the bay or whale watching expeditions?

That will not happen from this proposed wharf and pontoon. Lets extend the pontoons down stream for 200 m to the Promenade with a break in the middle for kayaks, canoes and smaller vessel to come inside. Make the pontoons wide so people can fish from them and add lights water and other facilities to attract yachts and passing vessels.

The Association submitted a comprehensive document “A Game Changer for the Bay CBD” to the Minister last week highlighting how adding the extended pontoons correctly designed could activate and rejuvenate this area of the CBD. We wait his response. The Shire and community will get the opportunity to comment on the Association’s proposal.

Thursday, 13 June 2019

Batemans Bay Independent Coastal Impact Assessment

What happened to the GHD "Wave Study"? or to give it its real name Batemans Bay Independent Coastal Impact Assessment.
Yes the one that was going to address the concerns of the Surfside Community about the new bridge's larger piles contributing to the down stream erosion on the North Shore. It was also used to close down discussion about extending floating pontoons downstream from the modified T-Wharf.



The study was completed in March - it may well have been peer reviewed by an "American Professor" but it is not freely available to the wider public. Why?

And what of Stage Two? Any truly independent targeted study would have answered many outstanding questions and given quantitative data plus highlighting the difficulties of building any structure on sand let alone a boat ramp in a locally known shifting sand area. Or is that just another sop to the locals boat owners to keep them in line?

The RMS Batemans Bay Independent Coastal Impact Assessment  Stage One – Impacts of the Batemans Bay Bridge Replacement Project  March 2019 has been reviewed and submitted to the Executive Director of Dept of Transport for NSW in the form of a Critical Analysis which may be read Critical Analysis of GHD Stage 1 Assessment

Monday, 27 May 2019

Faceless Foreshore Advisory Committee is Finished

Yes, the last meeting of tick-the-box committee meeting was held on 1 May. The Mayor and General Manager along with a number of obviously per-informed members did not attend this compete waste of time event. - the snacks were good by no biscuits.


As usual the attendees were talked at with no room for discussion however on this occasion we were given a sheet of paper to record our question? Why you may ask? Well why because some 4 weeks later we have not had a single reply. Not a single response to some simple and some difficult questions such as:
  • What boat washdown areas are there at the reopened boat ramps?
  • Are there fish cleaning tables and do they have a roof?
  • Do the boatramps meet the boatramp Guidelines/Standards?
  • Are there going to be life rings along the foreshore?
  • Will there be securing points at the boatramps with no floating pontoons? (pontoons - none)
  • What type of boatramp lighting will there be and where is it located?
  • What safety and information signs are there?

All foreshore type questions not shown on the presentation.

When it came to the T-wharf there was a big surprise. At the previous FAC we were presented with a plan/proposal to demolish part of the T-wharf as per the John Holland contract and to replace it with suitable floating pontoons.

See the Associations previous post on this matter. While we did not totally support the design it was a great start and what the Committee members had been waiting for and the Community had expected.
Well now the surprise. The T-wharf is to be maintained in the same format. - no change. Old piles on the waterside unusable to any one except a large ferry style vessel. But there is more. Two 30 m long floating pontoons attached to the T-wharf with securing piles on the outside. Yes on the outside of the pontoon so your vessel can come alongside and damage the hull as you secure it. That will limit the available space to one average cruising yacht and maybe a small runabout. The outer ends are unusable for the same reason and so is the shoreside.

But there is more. The movable connecting ramp to get from the T-wharf to the floating pontoons is so long it appears to be 28 m. You may ask why?: to meet the wheel chair requirements of slope gradient. No problem to accommodate accessibility but the proposed on-ramp takes up an estimate 78% of the available space of the pontoon. That leaves two narrow lanes on the shore and seaward side and then with the balance covered by the moving ramp. Now think of that when you try to cast a line with your rod. It will get snagged by the ramp handrails. Not to mention the danger of some child crawling under the ramp and a large wash from the ferry coming by lifting the pontoon and squashing or trapping the child between pontoon and on-ramp.

Now you may ask how we came to this ridiculous situation of maintaining the existing T-wharf when it was clearly stated in all communications that it would be removed and replaced. This replacement was the off-set that the boating public reluctantly accepted when RMS lowering the current bridge level to only 12 meter above the water. So the boating public has been ignored and tricked again. Did I answer the question as to how this came about NO. I will leave that to you to deduce but I can state that the Shire has played a significant role in directing this outcome.

Returning to the FAC itself and the members contributions.

What did the active members achieve in advising the RMS/John Holland project – NOTHING. Yes not a single idea that was put forward appears to have been accepted or incorporated into the foreshore or bridge project. I do think we got separate male and female toilet cubicles and a special section for those with a disability and maybe we may even get a smart litter bin – thanks Director Sharpe.

Now did the FAC fulfill the Community consultation role? Well, no-way because you the community did not know who gave their time to attend these meetings. Not one photo, not one joint gathering with the community and there is still the seal of secrecy and confidentiality over what we saw, so I am not able to tell you more about the traffic flows, parking spaces and design features of the project. When will the community “be informed” hopefully soon because the rate of spend on this project must be massive and your money is going into salaries, holes in the ground, concrete and steel at an alarming rate.

Monday, 20 May 2019

Concrete Wharf to be demolished

The Minister had finally approved the destruction of the concrete wharf and the building of floating pontoons. After some intensive lobbing and failed behind the scenes negotiating the go-ahead has been received for the long awaited establishment of floating pontoons. 


The days of old fashioned concrete weed encrusted piles with pipes and wires hanging underneath along with cracked and rusted reo bars bursting out of the surface has finally come to an end. A new purpose built boat-friendly designed floating pontoon will be installed before the end of the year. This will reduce the boating pressure on moorings, give access to fishing and cruising vessels and provide a safe platform for young people to throw in a fishing line.

A boating representative is quoted as saying: “The move to a modern floating pontoons with water, electricity and suitable lights has finally arrived. Fuel will also be available for the local and visiting vessels. No longer will skippers have to fear being trapped under this structure as the tide rises and vessels will not be damaged by the old wooden piles and protruding steel and concrete. This is a clear step into the future to use the Boating Now licence funds in a constructive and advantages way.”

Access to boater, fishos and those less able to climb onto a boat will be enhanced with a modern, secure and safe floating pontoons built by the internationally acclaimed company Bellinghams. The local marina manager and licence holders have gone out of their way to accommodate the boats having to move from the existing wharf during construction in Bermagui harbour.

Lets see this further north along NSW.



Wednesday, 8 May 2019

Standards - What standards?

Today bureaucrats phrase every new regulation or restriction in terms of increased safety or security. Yes saving lives while fishing by wearing life jackets or auditing your vessel and mooring to save the environment. What we got today is Maritime’ announcement that they are going to audit the 28,000 moorings and attached vessels to see if they comply with a standard that does not exist or if your vessel is seaworthy to criteria so subjective it would not pass the pub test all in the name of safety and the environment.

They state on their web page that if a vessel comes adrift from a mooring due to poor maintenance it could damage infrastructure, other vessels and the environment. Yes that is correct. The adrift vessel is responsible for any damage caused and is a mooring condition. Their argument that it cost Maritime money for salvage which could be used for boating infrastructure is very thin and we have yet to see Maritime salvage or tow a vessel.

Now what is wrong with this mooring and vessel audit?

Essentially nothing but the aims are inter alias; increase mooring compliance, remove mooring minders and reduce wait list for moorings plus some verbiage about a register of non-compliant vessels to protect secondary resale market purchases.

Where did all that come from? Million dollar water front house owners? Or may be the BIA members looking for more business via the RVAG committee?

Well lets look at the process.

Firstly the audit will be conducted by the local Boating Safety Officer (BSO) who, I am sure, has been adequately trained in inspecting moorings according to the NSW mooring standard…… but wait there is no standard, so how will they judge that it is non-compliant?

The BSO will audit your vessel to determine if they consider it to be seaworthy. OK by what standard? Sure it should have the correct markings and boatcode label but will the BOA check if the rig is in good condition or if the bilge pumps are working – no way. The FAQ have a set of defects that will attract a penalty notice but the majority are so subjective (hull and equipment in poor condition) that they would not pass in a court of law or even the pub test.


Now the outcome.

You will be issued with a non-compliance letter (certified mail requiring signature – joke) setting out the items to be rectified and the usual threat of fine and/or prosecution and a time-frame of usually 21 days.

If you object or cant meet the time conditions you have to contact the local BSO (yes the same one who issued the defect notice) to develop a “plan of action” to correct the non-compliance issues. The plan will have the items to be rectified and the schedule and has to be agreed by you and BSO!
When completed you have to provide proof of service and invoice from a qualified mooring contractor. Hello, what qualifications does this contractor have to have? There are none. RMS does not have a list and recommend you use the yellow pages! Or in respect of your vessel a qualified shipwright. Hello, have you seen one of those in a 100 nm radius of the Bay – no. Thankfully you can make a stat dec that you serviced the mooring yourself.

What are the consequences of doing nothing.

Maritime will issue you with a fine and a notice to remove the vessel – again certified mail requiring signature – more jokes by me. Can you appeal the audit and the mooring cancellation (assuming the legislation is changed) yes but to the very authority who issued the notice.

Now I understand this has been suggested to focus on Sydney area and the many mooring minders that hold mooring for when the owner can afford a better boat but the law is an ass and wrong.
Remove the 28 consecutive day restriction to say one year or permit the subletting of moorings (with notification) to a similar type of vessel. That would make proper use of the facilities.

Secondly, let the State through Maritime offer to take unused or not wanted vessels at no cost to the owner and to dispose of them via dismantling and recycling but not to auction. That would be a nice little business to be in and foster reuse of equipment. This along with the first suggestion will clear the mooring minders and unwanted vessels from the Sydney waterways. It worked in Florida and elsewhere in the USA so why cant it work here in Australia?

Sunday, 21 April 2019

Navigation Restriction – Clyde River – Batemans Bay – Bridge Works

The Batemans Bay Bridge project is proposing to implement a large exclusion zones across the Clyde River adjacent to the existing bridge. This is a large project with many challenges but it is not extraordinary and there are many previous instances of a bridge being built over a navigable waterway.

A Marine Notice SO1859 sets out the terms of the Regulated Area for the period 24 September 2018 to 6 September 2019.
See http://www.rms.nsw.gov.au/…/so1859-navigation-restriction-c…

The Regulated Area is the entire width of the Clyde River for a distance of approximately 500 metres upstream and 150 metres downstream of the Batemans Bay Bridge.

The Special Restrictions set out in the notice are:
• A maximum speed of four knots; and
• A ‘minimal wash’ zone is imposed
There don't appear to be any other restrictions such as
• creating a noise
• anchoring a vessel
• excluding certain vessels.

However there are other elements in the notices that indicate that a span of the bridge may be closed which will be shown as: series of three shapes in a vertical line comprising ball–triangle–ball, and during the night or at times of restricted visibility by a series of three lights in a vertical line comprising red–green–red. The dimension of the shapes are in the international regulations. (600 mm diameter)

Vessel operators should also note that divers may be in the water and their vessel will fly the usual Alpha Flag - white beside blue flag with the blue section featuring a swallow tail. Remember you must stay below 10 knots when within 60 metres of anyone in the water, or a safe distance and speed if that is not practicable.

Vessels engaged in the bridge works may display Restricted In Ability to Manoeuvre shapes and lights indicated during the day by three shapes in a vertical line comprising ball–diamond–ball, and during the night or at times of restricted visibility by a series of three lights in a vertical line comprising red–white–red.

Now here is an unusual one for those that know their day shapes
: A vessel displaying two flags ‘R’ over ‘Y flag (Romeo Yankee) which indicates all other vessel traffic must proceed at a slow speed that creates no wash when passing. An ‘R’ flag is indicated by a yellow cross (vertical and horizontal lines) on a red background, and a ‘Y’ flag is indicated by alternating red and yellow diagonal lines.

You must excuse the many spelling mistakes contained in the Marine Notice. The Notice should be published in the NSW Gazette and Maritime’s Marine Notice web site as per the Maritime Safety Act 1998 No 121 Section 12 however there does not appear to be any record in the NSW Gazette or legislation.

Frankly this Notice does not reference an Exclusion Zone and is wide open to interpretation. It may well have been covered in the Gazette. For example there is no mention of measuring devices for speed or distance off and more importantly if an person disputes an offence under this notice and his defense is that he did not know then Maritime Safety Officer or the Marine Area Command have to show evidence that the Marine Notice was on display and was published in the Gazette.
Watch this space or read the NSW Gazette.